The stadium was built in line with the UEFA/FIFA International and IOC standards.
With our immense engineering performance and quality, 18 short months sufficed to complete the electrical and mechanical systems of this project flawlessly.
The electromechanical and low-voltage current systems can be controlled through integration to a single automation system.

PROJECT DETAILS
| Categories: | |
| Project Scope of Work: | Electromechanical |
| Project Total Area: | 496.000 m² |
| Project Location: | Baku, Azerbaijan |
| Project Launch: | 2013 |
| Project Completion: | 2015 |
| Project Employer: | SOCAR (The State Oil Company of Azerbaijan Republic) |
| Project Main Contractor: | Tekfen İnşaat |
| Project Status: | Completed |